394    Improving Machinery Reliability

                      And so, it would be appropriate and beneficial to ponder:

                      Does our plant have defined work processes, or does work just somehow get done?
                      Are we supplying  the people who do the work in the field the information they
                      need to do their job?
                      Is what we are doing today going to change the way we do business tomorrow?


                                       Machinery Turnaround Planning

                      Figure  10-3 shows the familiar bar chart used  for typical  turnaround  planning.
                     But bar charts of the type shown can be no more accurate than the experience level
                     of their developer allows them to be.  Unless the developer is thoroughly  familiar
                     with turbomachinery overhauls and remembers task sequences as well as durations,
                     turnaround plans  will probably  not be too accurate. The job may take longer than
                     anticipated and could  delay  re-starting  of  the plant.  Conversely, the job could  be
                     overmanned to the point where it is done faster than necessary. Here, the plant could
                     lose out by  thus drawing skilled personnel  away from other jobs.  Work execution
                     may suffer from lack of continuity or the job may risk being executed in less than
                     diligent fashion.
                       To avoid the pitfalls of inaccurate planning, process plants would be well advised
                     to use a "Mechanical Procedures Manual," which could comprise such detailed out-


                                       LC-01/02 Lube System Repair And Flushing Procedure

                                                                      Verilied
                       Reassemble   A  Install 6 Line 0               Complele
                       Pump "A"   -Up  Pump "A
                                                                            Vendor Coverage
                       Verity Rolalion 01  r\   Lineup
                       SI Driven Pump e v   Pump"8 0
                       Remove And lnslatl In Localion "0
                       Pul1"HOl'A  DlOp All Vahes Belween   ReSeNOil 6 Flllers e
                       Cooler Bu%Ie    0 Clean 6 InspeCI. Replace Gaskels
                       InspxI For Metal And High Temperalure
                       Swam Damaqe
                       Salvenl.Clean Carlrldge Supwrl
                                                       no
                                                               0"CB
                        Rods. Relnslall Ftller. Carlridges.
                       New O.Rmq            e Far  n   Remove 200 Gal. 01 Sludgo   Per Day
                                         tmnll. nr,,--
                                                                       t  I  DoNolRemove
                                                                       [   I  Return Lines Bslween
                                               AP  Fller(lncl. Alarm)
                       Oblain 6 lnilall Insir.   TI  cmtar l"ld        I  I  Reservoir L Compressor
                        Hemwe Swlion Liner 8eIwen
                       Reservoir And Pumps. steam Clean. 0   111 E&G  Oki   'I
                                               Vi8  Pump 6 Driver Vibration
                       Then Coal Wilh EnmirblW (Spray On) And Re4nslall
                                             -
                         Acd Plopel Install. 01 Si;amers (&hll   Rellll Lube 01 Reservoir Wl3Mx) Gallons
                                             -  01 Teresslic 32
                       Relnslall New Gaskels   LI Circulation 3
                                                 Commence
                                       Hwk-Up
                        Arrange For Renlal Or
                       P              P c--c>- Fll;;z;: Discharge Temperalure   6 13 79 Revision 0
                       Blush Recorder
                       '13   14   15   16   I7   18   19   20   il   21   23   i4
                                   Figure 10-3. Detailed bar chart for turnaround task.
   425   426   427   428   429   430   431   432   433   434   435