             5.9 General scope of field work required for each reheat recovery
             boiler sheet 2

             5.9.1  Scope of work-field erection
             Pressure parts

                Furnace rear wall tubes
                Furnace rear wall tubes (wall panel—membrane)
                Furnace rear wall tubes (loose)
                                            00
                Weld tubes to header stubs—2-1/2 diameter, TIG weld
                Fit and weld filler bar at tube welds
                Fit and weld filler joining membrane panels
                Superheaters for reheat recovery boiler
                Tubes—connecting
                Tubes—sections
                Headers
                                                  00
                Weld superheater tubes; 1.77 OD 0.150 WT, BW (TIG)
                                       00
                Attemperators for recovery units
                Spray type—complete with body and internals (excludes welding)
                Drum type—complete with internals, piping, valves, and supports (excludes
                welding)

                Reheater for reheat recovery boiler
                Tubes—connecting
                Tubes—sections
                Headers
                                  00
                Weld reheater tubes; 2 OD, BW (TIG)
                Supply and riser tubes
                Headers
                Tubes—make up or supply
                Tubes—riser
                                            00
                Weld tubes to header stubs—4-1/2 diameter, TIG weld
                Downcomers
                Install downcomer
                Diameter weld, girth
                Diameter weld, ring
                Diameter weld, ring
                Smelt spout and hood
                Auxiliary equipment
                Floor and hopper support steel
                Suspension steel
                Buckstays
                Casing
                Burner wind box—primary, secondary, and tertiary
                Primary burners