Page 193 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 193

Coal-fired power plant Chapter  8 169


             8.33.2 Install over fire ductwork sheet 2

                                                     Installation man-hour
                                                Historical       Estimate

                                              MH      Qty   Unit   BM    BM
             Over fire air duct                                          0
             Transition duct section          32.00   Ton   0      Ton   0
             Bolted connection-duct transition to ID fan  0.26  EA  0  EA  0
             Duct sections                    32.00   Ton   0      Ton   0
             Duct elbow                       32.00   Ton   0      Ton   0
             Field joint—weld flange          0.35    LF    0      LF    0
             Bolted connection-duct sections  0.26    EA    0      EA    0
             Expansion joint                  40.00   Ton   0      Ton   0
             Duct support                     40.00   Ton   0      Ton   0




             8.34 ID, FD, primary air and over fire ductwork—Installation
             man hours


                                                            Estimated  Actual
                                                            BM         BM
             ID ductwork                                    0          0
             Primary air ductwork                           0          0
             FD ductwork                                    0          0
             Over fire air duct                             0          0
             ID, OFA, FD, and over fire ductwork—installation man-hours  0  0
   188   189   190   191   192   193   194   195   196   197   198