232 Industrial Process Plant Construction Estimating and Man-Hour Analysis


            11.7.3 Down comers & code piping sheet 3

                                                 Historical   Estimate
            Description                        MH     Unit  Qty   Unit  BM

            Erect and install downcomers and code piping                1811
                             00
            Handle downcomers, 12 OD   0.562 WT  1.32  LF   336.0  LF   444
                40 0
                        00
            Downcomers, 12 OD   0.562 WT BW    12.6   EA    16.8  EA    212
                    00
            Handle 12 300# BW main stop valve and  5.4  EA  2.4   EA    13
              ck valve
              12   0.562 WT CS BW              12.60  EA    4.8   EA    60
                00
            Handle 10 300# BW feed water stop and  136.00  EA  2.4  EA  326
                    00
              ck valve
              10   0.562 WT CS BW              4.00   EA    4.8   EA    19
                00
            Handle 8 300# BW spray control valves  7.20  EA  4.8  EA    35
                   00
              8   0.562 WT CS BW               8.40   EA    9.6   EA    81
               00
            Handle 3 300# safety valves        2.70   EA    3.6   EA    10
                   00
              3   0.375 WT CS BW               1.50   EA    7.2   EA    11
               00
            Handle 3 300# control valves—boiler  2.70  EA   2.4   EA    6
                   00
              3   0.375 WT CS BW               1.50   EA    4.8   EA    7
               00
            Handle 2 300# control valves—boiler  1.00  EA   2.4   EA    2
                   00
              2   0.375 WT CS BW               1.10   EA    4.8   EA    5
               00
            Handle 4 300# flanged flow elements  3.60  EA   7.2   EA    26
                   00
            4 300# Bolt up                     1.60   EA    14.4  EA    23
             00
            Handle 10   0.562 pipe             1.10   LF    192.0  LF   211
                    00
            Handle 8   0.562 pipe              0.88   LF    192.0  LF   169
                   00
            Handle 4   0.375 pipe              0.28   LF    270.0  LF   76
                   00
            Handle 3   0.375 pipe              0.21   LF    192.0  LF   40
                   00
                   00
            Handle 2   0.375 pipe              0.18   LF    192.0  LF   35
            11.8 Waste heat boiler-pressure parts and piping installation
            man hours
                                                             Actual  Estimated
                                                             BM     BM
            Install steam and mud drums                      1245   1245
            Generating bank tubes                            4354   4354
            Ground assembly—headers, furnace, and water wall panels  3230  3230
            Erect headers and wall panels, fit and weld water wall panels  5291  5291
            Fit and weld water wall tubes; 2-31/32 OD   0.203 WT, BW (TIG)  8295  8295
                                                00
                                      00
            Erect, fit, and weld primary/secondary headers and superheater  1817  1817
              elements
            Burner system                                    492    492
            Sootblowers                                      1280   1280
            Erect and install downcomers and code piping     1811   1811
            Waste heat boiler-pressure parts and piping installation man-hours  27,815  27,815