Page 34 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 34

4 Industrial process plant construction estimating and man-hour analysis


                 MH/BW  10.00             y = 0.3339x + 0.2528…  Series1
                                                               Linear (Series1)
                   0.00
                       0    5    10   15   20    25   30       Linear (Series1)
                                    Pipe size
            FIG. 1.2.1 CS BW-downhill.

                                          2
                 The coefficient of determination, R , is exactly +1 and indicates a positive fit,
              and all points lie exactly on the straight line. The relationship between X and Y
              variables is such that as X increases and Y increases.
   29   30   31   32   33   34   35   36   37   38   39