272       CHAPTER 8  The Material Planning Process



                                          material type, and organizational level. We have also discussed various data
                                          (views) of the material master in previous chapters. In Chapter 5, we intro-
                                          duced MRP and work scheduling views, but we did not examine them in depth.
                                          In this section we will discuss these views at length because they are more
                                          directly relevant in material planning. In addition, we will discuss product
                                          groups as they relate to material planning.



                                          MATERIAL MASTER
                                          Data related to MRP and work scheduling are illustrated in Figure 8-2. MRP
                                          data can be quite extensive. Consequently, they are divided into four views
                                          or tabs—MRP 1, MRP 2, MRP 3, and MRP 4—to make the data more read-
                                          able. These data are relevant to both discrete and repetitive manufacturing
                                          (explained in Chapter 6). Our discussion is limited to data relevant to dis-
                                          crete manufacturing. Both MRP and work scheduling data are defi ned  at
                                          the plant level. That is, they are specifi c to each plant. These data determine
                                          which strategies and techniques the company will use when planning for the
                                          material. Each MRP view provides a specifi c set of data, as indicated in
                                          the following list.














































                                    Figure 8-2: Material master data for material planning






                                                                                                                 31/01/11   6:42 AM
          CH008.indd   272                                                                                       31/01/11   6:42 AM
          CH008.indd   272
   285   286   287   288   289   290   291   292   293   294   295