Page 332 - Intelligent Digital Oil And Gas Fields
P. 332

276                                       Intelligent Digital Oil and Gas Fields


                                                       plot  (without
                                                       The
                                                       2013a,b).  case  base



                                                       al.  The
                                                       et
                                                       Carvajal  ICV.  with


                                                       (from  cut
                                                       ICVs  water

                                                       five  and
                                                       with  rate
                                                       well  oil  with
                                                       horizontal  profiles



                                                       a  cut ICV) water cut progressively increases with time while oil is declined. Although using ICV, the water cut is controlled between 0.3 and 0.4, the  164814.)
                                                       in  water  SPE
                                                       controls  and  from


                                                       proactive  rate  oil  permission



                                                       and  both  with
                                                       ICV  for  ICV
                                                       without  without  (Taken  flat.


                                                       profiles  (BC)  almost


                                                       Production  case  base  a  is production




                                                       7.17  compared  rate
                                                       Fig.  oil
   327   328   329   330   331   332   333   334   335   336   337