Page 332 - Intelligent Digital Oil And Gas Fields
P. 332
276 Intelligent Digital Oil and Gas Fields
plot (without
The
2013a,b). case base
al. The
et
Carvajal ICV. with
(from cut
ICVs water
five and
with rate
well oil with
horizontal profiles
a cut ICV) water cut progressively increases with time while oil is declined. Although using ICV, the water cut is controlled between 0.3 and 0.4, the 164814.)
in water SPE
controls and from
proactive rate oil permission
and both with
ICV for ICV
without without (Taken flat.
profiles (BC) almost
Production case base a is production
7.17 compared rate
Fig. oil

