Page 10 - Introduction to Petroleum Engineering
P. 10

x                                                          COnTEnTs

               10.7  Activities                                            203
                   10.7.1  Further Reading                                 203
                   10.7.2  True/False                                      203
                   10.7.3  Exercises                                       204

           11  Upstream Facilities                                         205
               11.1  Onshore Facilities                                    205
               11.2  Flash Calculation for separators                      208
               11.3  Pressure Rating for separators                        211
               11.4  single‐Phase Flow in Pipe                             213
               11.5  Multiphase Flow in Pipe                               216
                   11.5.1  Modeling Multiphase Flow in Pipes               217
               11.6  Well Patterns                                         218
                   11.6.1  Intelligent Wells and Intelligent Fields        219
               11.7  Offshore Facilities                                   221
               11.8  Urban Operations: The Barnett shale                   224
               11.9  Activities                                            225
                   11.9.1  Further Reading                                 225
                   11.9.2  True/False                                      225
                   11.9.3  Exercises                                       225
           12  transient Well testing                                      227

               12.1  Pressure Transient Testing                            227
                   12.1.1  Flow Regimes                                    228
                   12.1.2  Types of Pressure Transient Tests               228
               12.2  Oil Well Pressure Transient Testing                   229
                   12.2.1  Pressure Buildup Test                           232
                   12.2.2  Interpreting Pressure Transient Tests           235
                   12.2.3  Radius of Investigation of a Liquid Well        237
               12.3  Gas Well Pressure Transient Testing                   237
                   12.3.1  Diffusivity Equation                            238
                   12.3.2  Pressure Buildup Test in a Gas Well             238
                   12.3.3  Radius of Investigation                         239
                   12.3.4  Pressure Drawdown Test and the Reservoir Limit Test   240
                   12.3.5  Rate Transient Analysis                         241
                   12.3.6  Two‐Rate Test                                   242
               12.4  Gas Well Deliverability                               242
                   12.4.1  The sBA Method                                  244
                   12.4.2  The LIT Method                                  245
               12.5  summary of Transient Well Testing                     246
               12.6  Activities                                            246
                   12.6.1  Further Reading                                 246
                   12.6.2  True/False                                      246
                   12.6.3  Exercises                                       247
   5   6   7   8   9   10   11   12   13   14   15