Flood Hazard Mapping,                                  When the water level of a river is below the river’s
                                                             banks, the river is at a  normal stage  .  When the water level
        Assessment, and Risks
                                                             is even with the banks, the river is at  bankfull stage  .  And
          The water level and discharge of a river fluctuates from   when the water level exceeds (overflows) the banks, the
        day to day, week to week, and month to month. These   river is at a  flood stage  .
        changes are measured at  gaging stations,  with a permanent     Early in July 1994, Tropical Storm Alberto entered
        water-level indicator and recorder. On a typical August day   Georgia and remained in a fixed position for several days.
        in downtown St. Louis, Missouri, the Mississippi River   More than 20 inches of rain fell in west-central Georgia
        normally has a discharge of about 130,000 cubic feet of   over those three days and caused severe flooding along the
        water per second and water levels well below the boat   Flint River. Montezuma, Georgia, was one of the towns
        docks and concrete  levees  (retaining walls). However, at the   along the Flint River that was flooded, and it is the subject

        peak of an historic 1993 flood, the river discharged more   of  Activity  11.6 . Some of the flood damage experienced by


        than a million cubic feet of water per second (8 times the   Montezuma, Georgia, in 1994 could have been prevented by
        normal amount), swept away docks, and reached water   planning ahead.
        levels at the very edge of the highest levees.











                                                      Looking for additional review and lab prep materials? Go to
                                                    www.masteringgeology.com for Pre-Lab Videos, Geoscience
                                                    Animations, RSS Feeds, Key Term Study Tools, The Math You Need, an
                                                    optional Pearson eText and more.

















































        296  ■  L ABOR ATORY  11
   321   322   323   324   325   326   327   328   329   330   331