Page 142 - Lean six sigma demystified
P. 142

Chapter 4  e xC e L   Power  Too LS   for   Lean   Six   Sigm a        121














                                         FIGURE 4-18 • Creating a validation list.























                                  FIGURE 4-19 • Selecting list for validation.

                             Then select columns B:G and Data Validation-List to specify the source list
                           (=$I$2:$I$50). See Fig. 4-19.
                             This will add a dropdown list to every cell so that employees can type a valid
                           time (e.g., 2.5) or select a valid time (Fig. 4-20). Then just hide column I and
                           save the workbook.















                                                        FIGURE 4-20 • Valida-
                                                        tion using menu of list
                                                        items.
   137   138   139   140   141   142   143   144   145   146   147