Page 293 - Lean six sigma demystified
P. 293

Chapter 8  Su S taining   i mpr ovement          271


                             •   Control methods (e.g., inspection, XbarR chart, and so on)
                             •   Reaction plan—what to do when the characteristic goes out of control
                                (e.g., adjust, recheck, quarantine)

                             While control plans are beyond the scope of Lean Six Sigma Demystified, it’s
                           useful to know that there’s more rigor available if needed. There’s a checklist
                           for developing control plans, FMEAs, and flowcharts in the QI Macros APQP
                           Checklist template (Fig. 8.19).


































                       Figure 8-19 • Control plan checklist.
   288   289   290   291   292   293   294   295   296   297   298