Page 293 - Lean six sigma demystified
P. 293
Chapter 8 Su S taining i mpr ovement 271
• Control methods (e.g., inspection, XbarR chart, and so on)
• Reaction plan—what to do when the characteristic goes out of control
(e.g., adjust, recheck, quarantine)
While control plans are beyond the scope of Lean Six Sigma Demystified, it’s
useful to know that there’s more rigor available if needed. There’s a checklist
for developing control plans, FMEAs, and flowcharts in the QI Macros APQP
Checklist template (Fig. 8.19).
Figure 8-19 • Control plan checklist.