Page 288 - Lean six sigma demystified
P. 288

266        Lean Six Sigma  DemystifieD


                             14.0
                                                                                        T22
                                                                                        UCL2
                             12.0

                             10.0

                          Pull strength  y × die height ×2  8.0


                              6.0


                              4.0

                              2.0


                              0.0
                                 1  2  3  4  5  6  7  8  9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
                                                          Date/time/period
                        Figure 8-15 • Hotelling chart.








                                                          Days between retained foreign objects
                                     350

                                     300
                                    Days between retained foreign objects  250



                                     200

                                     150

                                     100
                                                                    79.26
                                      50
                                                                   19.4444
                                       0
                                       4/3/03  4/28/03  7/5/03  9/4/03  10/2/03  11/1/03  1/30/04  3/11/04  5/25/04  8/4/04  9/8/04  12/7/04  3/3/05  9/13/05  4/26/06  1/6/07 7/31/07

                                                                   2003-2007
                 Figure 8-16 • g charts.
   283   284   285   286   287   288   289   290   291   292   293