150   Machinery Component Maintenance and Repair

                           Check alignment of  mating flanges. Avoid use of  force to achieve
                           alignment. Verify that:

                           1. The two flange faces are parallel to each other within  1/32  in. at
                              the extremity of the raised face
                           2.  Flange centerlines coincide within  1/8  in.

                         Joints not meeting these criteria should be rejected.




                                 Controlled Torque Bolt-Up of Flanged Connections

                         Experience shows that controlled torque bolt-up is warranted for cer-
                       tain flanged connections. These would typically include:
                           All  flanges  (all  ratings  and  sizes)  with  a  design  temperature
                           > 900°F.
                           All flanges (all ratings) 12 in. diameter and larger with a design tem-
                           perature  > 650°F.
                           All 6 in. diameter and larger 1500 pound class flanges with a design
                           temperature > 650°F.
                           All 8 in. diameter and larger 900 pound class flanges with a design
                           temperature > 650°F.
                           All flanges not accessible from a maintenance platform and  > 50 ft
                           above grade.

                         In addition, it is generally appropriate to apply the above criteria to
                       flanged connections on equipment and other components such as:

                         0 Valve bonnets, where the valve is positioned to include the above ref-
                           erenced design temperature/size/f lange rating category.
                         0 Flanged equipment closures where they qualify for inclusion in the
                           above categories.
                           All flanged connections which will eventually be covered with low
                           temperature insulation within the above reference criteria.

                         Adherence to the following procedure is recommended for controlled
                       torquing of  line flanges, bonnet joints, etc.,  when specified.

                       Preparation

                           Thoroughly clean the flange faces and check for scars. Defects ex-
                           ceeding the permissible limits given in Table 4-1 should be repaired.