Page 338 - Machinery Component Maintenance
P. 338

320  Machinery Component Maintenance and Repair

             stalled.  The operation of  the  instrument and the  determination of  the
             masses required to correct the unbalance is carried out by trained person-
             nel. Not only does this result in considerable cost savings but the method
             also provides a significant saving in time compared to rebalancing on a
             balancing machine. With careful preparation, field balancing of a blower
             need not take more than 30-60  minutes.
               It has been shown in practice that in over 95 percent of all blowers field
             balancing in one plane is sufficient to reduce unbalance vibrations to per-
             missible and safe values. The method is as follows:

               1.  The balancing instrument is used to measure the unbalance vibra-
                  tion at the bearing positions nearest to the blower rotor  (Figures
                  6-41 and 6-42). The instrument suppresses with a high degree of
                  separation any extraneous vibration and shows the amount and the
                  angular position of the rotational frequency vibrations. Both mea-
                  sured values-also  designated as “initial unbalance”-are  entered
                  on a vector diagram (Figure 6-43).





































             Figure 6-41.  Individual stages in the field balancing of a blower using balancing and vibra-
             tion analyzer “VIBROTEST.”
   333   334   335   336   337   338   339   340   341   342   343