Page 576 - Marine Structural Design
P. 576

552                                                      Part V Risk Assessment

                 Import/export systems such as risers, flowlines and offloading systems
                   catastrophic - resulting in major oil spill or fire due to the leakage of oil and gas
                   critical - leading to moderate oil spill and downtime of above 6 months
                   severe - ruptures in the pipe require repair and replacement and  downtime of  1 to  6
                   months
                   minor - repair or replacement of the riser, flowline and  offloading systems that cause
                   shut-down of less than one month.
                 For generic methodologies for risk-based inspection, reference is made to AF'I  RP 580 (MI,
                 2002). This newly developed RP contains the following Sections:
                    Introduction to risk-based inspection
                    Screen and boundary identification
                    Data and information collection for RBI assessment
                    Identifylng deterioration mechanisms and failure modes
                    Assessing likelihood of failure
                    Assessing consequences of failures
                    Assessing risk
                    Risk management with inspection activities
                    Other risk mitigation activities
                    Reassessment and updating RBI assessment
                    Roles, responsibilities, training and qualification
                    RBI documentation and record keeping
                 The formulation for probability and risk-based inspection has been given in Part IV Chapter
                 28.  The  effectiveness  of  inspection  depends  on the  degradation  mechanism  and  rate,
                 inspection scope/frequency and detection capability as well as the usefulness of the mitigation.
                 For FPSO, the biggest benefit from the use of risk-based inspection is perhaps the reduced loss
                 of production.

                 30.7  Environmental Impact Assessment
                 In  many  situations,  an  environmental impact  assessment  must  be  conducted prior  to  the
                 execution  of an  offshore  field  development.  The  results  of  the  environmental  impact
                 assessment  may  be  used  to  minimize  the  environmental impact  from  development  and
                 operation of the oil/gas field. The scope of an environmental impact assessment may depend
                 on the geographical regions and the characteristics of the field, and may for example include
                 the following:
                    Investigate distribution, population size and  biology of  key  species of  fish,  birds  and
                   mammals
                   Evaluate food webs and tropical interactions, energy transfer in the ecosystem,
                   Assess environmental toxins in sediments, benthic organisms and fish
   571   572   573   574   575   576   577   578   579   580   581