Page 578 - Marine Structural Design
P. 578
554 Part V Risk Assessment
11. Gilbert, R.B., Ward, E.G. and Wolford, A.J. (2001), “A Comparative Risk Analysis of
FPSOs with Other Deepwater Production Systems in the Gulf of Mexico”, Offshore
Technology Conference, OTC 13 173.
12. Gudmestad, O.T. et a1 (1999), “Basics of Offshore Petroleum Engineering and
Development of Marine Facilities with Emphasis on Arctic Offshore”, ISBN 5-7246-
0100-1.
13. Haugen, S (1991), “Probabilistic Evaluation of Frequency of Collision between Ships
and Offshore Platfonns”, Drhg Thesis, Division of Marine Structures, NTNU, MTA-
report 1991530.
14. Karsan, D.I., Aggarwal, R.K., Nesje, J.D., Bhattachajee, S., Amey, C.E., Haire, B.M.
and Ballesio, J.E. (1999), “Risk Assessment of Tanker Based Floating Production
Storage and Offloading (FPSO) System in Deepwater Gulf of Mexico”, OTC 11000.
15. Lassagne, M.G., Pang, D.X. and Vieira, P. (2001), “Prescriptive and Risk-Based
Approaches to Regulation: The Case of FPSOs in Deepwater Gulf of Mexico”, OTC
12950.
16. MacDonald, A., Cain, M., Aggarwal, R.K., Vivalda, C. and Lie, O.E., (1999), “Collision
Risks Associated with FPSOs in deep Water Gulf of Mexico”, OTC 10999.
17. Nesje, J.D., Aggarwal, R.K., Petrauskas, C., Vennem, J.E., Keolanul, G.L., Hoffman, J.
and McDonnell, R. (1 999), “Risk Assessment Technology and its Appliction to Tanker
Based Floting Production Storage and Offloading (FPSO) Systems”, OTC 19998.
18. NPD (1992), “Regulations Relating to Implementation and use of Risk Analysis in the
Petroleum Activities”, Norwegian Petroleum Directorate, Stavanger, Norway.
19. NTS (1998), “NORSOK Standard for Design of Steel Structures Annex A, NORSOK N-
004”, Rev. 1, Norway.
20. Pappas, J. (200 l),”The NORSOK Procedure on Probabilistic Explosion Simulation”,
Paper 5.5.1, ERA Conference, “Major Hazards Offshore”, London, 27-28 Nov. 2001.
21. Saubestre, V., Khalfi, J-P., Paygnard, J-C. (1999, “Integrated Fire Analysis: Application
to Offshore Cases”, OMAE-95, Copenhagen
22. UK HSE (1992), “Safety Case Regulation”, United Kingdom Health and Safety
Executives.
23. UK HSE (1995), “Prevention of Fire and Explosion, and Emergency Response
Regulation”, United Kingdom Health and Safety Executives.
24. Vinnem, J.E. (1999), “Quantified Risk Assessment - Principles, Modelling and
Applications of QRA Studies”, Kluwer Academic Publishers.
25. Walker, S., Corr, B., Tam, V., O’Connor, P. and Bucknell, J. (2002), “New Guidance on
Fire and Explosion Engineering”, 21” Int. Conf. On Offshore Mechanics and Arctic
Engineering (OMAE), OMAE2002-28623.
26. Wolford, A.J., Lin, J.C., Liming, J.K., Lidstone, A. and Sheppard, R.E. (2001),
“Integrated Risk based Design of FPSO Topside, Structural and mine Systems,;’ OTC
12948.
27. Xu, T., Bai, Y., Wang, M. and Bea, R. (2001),”Risk-based Optimum Inspection of
FPSO’, OTC 12352.

