'hble 1.5  Examples of water management, UK
                        ._
            Type       Application   Scenario                    Solution                     Cost benefit
            Audit      Cellophane   750 m3/day of water unaccounted for   Fix leak            tlOO000p.a. saving[$l41580]*
                       production
            Audit      Laboratory   Mains water used for single-pass cooling,  Fit cooler (€2000) [$2831]*   6 month payback
                                   12 m3/day
            Housekeeping  Resin factory   Wash water contaminated by spillages   Fit drip trays to point sources   Effluent COD reduced by 75%,
                                   from point sources                                         €3000 p.a. saving [$4217]*
            Housekeeping  Plating plant   Significant drag out of chemicals from   Improve drainage around plating bath   Reduced rinsewater contamination,
                                   plating bath into rinse bath                               €1000 p.a. saving [$1416]*
            Reuse      Plating plant   0.4 m3/h mains water fed to three rinsing  Use counter-current serial flow to all   50% water saving, €1500 pa. [$2  241'
                                   baths in parallel, 1.2 m3/h In total   three baths
            Recycling   Cadmium    Zero discharge of cadmium imposed by   Installation of deionisation plant to   12 monthpayback
                      plating      regulator                    recover cadmium and water from
                                                                effluent

            * Based on rate of 1.4158.02/06/2002.