Page 330 - Pipelines and Risers
P. 330

Risk Analysis applied to Subsea Piperine Engineering                 303


        16.10 References
         1.  Bai, Y., Serheim, M., NMland, S. and Damsleth, P. (1999) “LCC Modeling as a Decision
           Making Tool in Pipeline Design”, Proc. of OMAE’99.
        2.  Bea, R. (1994) “The Role of Human Error in the Design, Construction and Reliability of
           Marine Structures”, Ship Structure Committee, USA, SSC-378.
        3.  Bea, R. (1997) in Journal of Reliability Engineering and System Safety, Vol. 52, Elsevier
           Science Limited.
        4.  Dougherty, E.M. and Fragola, J.R. (1986) “Human Reliability Analysis”, John Wiley and
           Sons, New York, 1986.
        5.  Edmondson, J.N.  (1993) “Human  Reliability Estimates within Offshore Safety Cases”,
           Proc. of symposium on Human Factors in Offshore Design Cases, Aberdeen, Scotland.
        6.  HGSystem 3.0, Edited by Post, I.,  Shell Research Limited, Thornton Research Center, PO
           Box 1, Chester, United Kingdom, TNER 94.059.
        7.  Norwegian Petroleum Directorate, (1992) “Regulations Concerning Implementation and
           use of Risk Analysis in the Petroleum Industry”, YA-049.
        8.  Olshausen, K. D. (1998) “Consequence Modeling”, Seminar on Pipeline Safety at Statoil
           by Scandpower A.S., Stavanger.
        9.  OREDA (1992) “Offshore Reliability Data Book”, Veritec.
        10. PARLOC’94 “The Update of Loss of Containment Data for Offshore Pipelines”, OTH 95
           468, HSE Books, 1996.
        11. Sorheim, M. and Bai, Y. (1999) “Risk Analysis Applied to Subsea Pipeline Engineering”,
           Proc. of OMAE’99.
        12. Swain, A. D. and Guttman, H.E. (1981) “Handbook of Human Reliability Analysis with
           Emphasis on Nuclear Power Plant Applications”, NUREG/CR-1278, Washington D.C.,
           US Nuclear Regulatory Commission.
        13. Vinnem, J.E.  (1996) “Quantified Risk Assessment for Offshore Petroleum Installations -
           A  Decision  Support  Tool”,  Lecture  Notes  at  Norwegian  University  of  Science  and
           Technology, Jan. 1996.
        14. Willcocks, J. and Bai, Y.  (2000) “Risk Based Inspection and Integrity Management of
           Pipeline Systems”, Proc. of ISOPE’2000.
        15. Williams, J.C. (1988) “A Data-based Method for Assessing and Reducing Human Error to
           Improve Operational Experience”, Proc. of  IEEJ3, 4th Conference on Human Factors in
           Power Plants, California.
   325   326   327   328   329   330   331   332   333   334   335