Page 390 - Pipelines and Risers
P. 390

Date          Location        Length   OD   Wall   Steel Source, Type   Welding Method
                                                                      (in)   (mm)
                                1985*    Germany, Megal I1 pipeline   3.2 km, trial   Germany, UOE   Manual welding as per 1993
                                                             section only                        Schliichtem to Wetter line
                                1986*       Czechoslovakia    1.6 km   56   15.6   Germany, UOE
                                        Alberta Canada, Empress East   50 km   42   10.6   Japan, UOE   Part mechanized (126 welds)
                                           Compressor Station
                                       Germany, Schliichtem to Wetter,   260 km   48   18.3   Germany, UOE   Mostly manual. Mechanized for 50
                                              Ruhrgas                                           km Weme to Sundem section.
                                1994   Alberta Canada, Mitzihwin project   53.8 km   48   12.1   Canada, spiral-   ~   Mechanized for 53.8 km
                                                                                     DSAW.

                              Note: These projects involved use of X80 sections in X70 pipelines so operational stresses were reduced pro rata.
   385   386   387   388   389   390   391   392   393   394   395