Page 391 - Pipelines and Risers
P. 391

Date   Location   Length   OD   Wall   Steel Source, Type   Welding Method
  (in)   (mm)
 1985*   Germany, Megal I1 pipeline   3.2 km, trial   Germany, UOE   Manual welding as per 1993
 section only                Schliichtem to Wetter line
 1986*   Czechoslovakia   1.6 km   56   15.6   Germany, UOE
 Alberta Canada, Empress East   50 km   42   10.6   Japan, UOE   Part mechanized (126 welds)
 Compressor Station
 Germany, Schliichtem to Wetter,   260 km   48   18.3   Germany, UOE   Mostly manual. Mechanized for 50
 Ruhrgas                    km Weme to Sundem section.
 1994   Alberta Canada, Mitzihwin project   53.8 km   48   12.1   Canada, spiral-   ~   Mechanized for 53.8 km
                 DSAW.

 Note: These projects involved use of X80 sections in X70 pipelines so operational stresses were reduced pro rata.
   386   387   388   389   390   391   392   393   394   395   396