Page 427 - Planning and Design of Airports
P. 427

Airport Drainage    371































































            FIGURE 9-13  Drain inlet capacity versus maximum surface storage, L = 300 ft and
            L = 400 ft, C.F.S. = cubic feet per second (Corps of Engineers.)
   422   423   424   425   426   427   428   429   430   431   432