Page 423 - Planning and Design of Airports
P. 423

No Ponding of Runoff



                                               Drain Inlet   Critical Contribution to
                  Standard Supply Curve No. ¥ DA  Capacity     System





                                        Weighted Supply Curve   (col. 18 + col. 5)  Q d , ft. 3 /s (col. 21 ¥ col. 5)  Q d , ft. 3 /s (col. 24 ¥ col. 5)





                     Unpaved Areas                ft 3 /s/acre    q d , ft 3 /s/acre
             Paved                            t c , min     t c , min
             Areas   Bare  Turf  Total            q d
             15      16   17     18    19   20  21   22   23   24    25
             11.94        40.22  52.16  1.6  24  1.8  59.0  30  1.8  59.0
                                                          40   1.7   55.8
             11.38        38.31  49.69  1.6  23  2.0  62.5  25  2.0  62.5
                                                          30   2.0   62.5
                                                          40   1.8   56.2
             11.38        38.31  49.69  1.6  23  2.0  62.5  25  2.0  62.5
                                                          30   2.0   62.5
                                                          40   1.8   56.2









            Assuming No Ponding of Runoff



            Inflow into Underground Drains, ft /s, Corresponding to Adopted Value of t  (col 10)
                                 3
                                                          c
                                          Inlet

            2                                                          Total
            13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30
                                                                       59.0
                                                                       121.5
            56.2                                                       168.2
   418   419   420   421   422   423   424   425   426   427   428