Page 82 - Plant design and economics for chemical engineers
P. 82

TABLE 4
                    HAZOP   study results for process in Fig. 3-1

                     Equipment  Deviations                Consequences of
                     reference  from     What event       this deviation on  Additional
                     and operating  operating  could cause  item of equipment  implications of  Process
                     conditions  conditions  this  deviation?  under consideration this consequence  indications Notes and questions
                     Storage tank  Level
                     T-l        Less      1. Tank runs dry  Pump  cavitates  Damage to pump LIA-1,  Can reagent react/
                                                                                      FICA-l    explode if over-
                                                                                                heated in pump?
                                          2. Rupture 4-in.  Reagent released  Potential fire  LIA-1,  Estimate  release
                                            discharge                                 FICA-l    quantity.
                                                                                               Consider second LAL
                                                                                                shutdown on pump.
                                          3. V-3 open or broken Reagent released  Potential fire  LIA-1  Estimate  release
                                                                                                quantity.
                                          4. V-l open or broken Reagent released  Potential fire  LIA-1  Consider V-l protection.
                                          5. Tank rupture  Reagent released  Potential fire  LIA-1  What external events
                                                                                                can cause rupture?
                                 More     6. Unload too much  Tank overfills  Reagent released LIA-1  Is RV-1 designed to
                                            from tank truck               via RV-1              relieve liquid at
                                                                                                loading rate?
                                                                                               Consider  second
                                                                                                 high level shutoff.
                                          7. Reverse flow from Tank overfills  Reagent released LIA-1  Consider check valve
                                            process                       via RV-1               in pump discharge line.
                                 No      Same as less                                          Consider second LAH
                                                                                                 shutdown on feedlines.
                                 Composition
                                 Other than  8. Wrong reagent  Possible reaction  Possible tank  Consider  sampling
                                                                           rupture               before  unloading.
                                As well as  9. Impurity in  If volatile, possible              Are other materials
                                            reagent        overpressure                         delivered in trucks?
   77   78   79   80   81   82   83   84   85   86   87