Generators and Motors: Theory and Testing Chapter | 4  47


              7. On load tests.
              8. Trial run test under supervision.
              9. Motor performance characteristic test.
             10. Vibration tests. These tests are done under no-load and full-load condi-
                 tions, and a trial run condition.