Page 58 - Practical Ship Design
P. 58

Introduction, Methods and Data                                       29


         Table 1.4
         conriniurion


         K   L     M     N     0     P     Q      R    S    T     U       V
         7   T    UB     BID   T/D   UD    C,     A    Crew  Speed   Machy.   SHP
             screw                                                type    (metric)

         4.20  5.5   9.04   1.48   0.46   13.40   0.533*   3800  209   30.0   CODOG   56000
         4.60     7.59   1.48   0.41   11.21   0.49  1   4750  225   29.0   CODOG   50000
         3. 10    7.82   1.63   0.49   12.77   0.499   1320  98   28.0   CODOG   18400
         4.00     7.97   1.89   0.55   15.06   0.512   3200  156   25.0   CODAD   20000
         4.50  5.7   9.49   1.47   0.47   13.97   0.484   4170  216   30.0   CODOG   46200
         4.15  6.5   8.40   1.58   0.45   13.31   0.477   3600  225   30.0   CODOG   5 1600
         5.00     9.13   1.53   0.51   13.97   0.417   5045  400   31.5   CODOG   55000
         4.10  8.4   8.91   1.45   0.46   12.92   0.485   3040  232   32.0   CODOG   50000
         3.70     9.47   1.41   0.46   13.37   0.543*   2500  185   35.0   CODOG   50000
         3.40     8.15   1.60   0.47   13.06   0.455   1780  130   37.5   CODOG   NIA
         3.80     7.61   1.74   0.49   13.24   0.467   2500  I 15   27.0   CODOG   48000
         4.30     8.02   1.60   0.48   12.83   0.45  1   3320  141   29.0   CODOG   27000
         4.30     8.36   1.62   0.48   13.55   0.460   3630  176   30.0   COGOG   50000
         6.00  6.5   8.35   1.71   0.59   14.29   0.473   7300  320   32.0   ST TUR   1 10000
         5.00     8.21   1.47   0.53   12.09   0.47  1   3900  180   32.0   COGAG   69000
         4.80  6.0   8.45   1.51   0.49   12.75   0.48 I   4400  222   30.0   COGOG   54600
         4.80  6.4   9.22   1.51   0.49   13.92   0.48 1   4800  222   30.0   COGOG   54600
         4.30  5.5   8.04   1.72   0.48   13.82   0.504**  4200  177   28.0   CODLAG  38400
         5.80  8.8   9.62   1.31   0.45   12.62   0.496   8040  319   33.0   G.T.   80000
         4.50  7.5   9.90   1.42   0.47   14.05   0.476   4100  206   29.0   G.T.   4 1000
         Where Cb figure\ calculatedfrom displacements appear incorrect by up to 10% these are marked *; incorrect by
         more than  10% these are marked **.
         # Max. beam = 16.1 m.





           A proforma for extracting dimensions and similar data from June’s has been
         completed as Table 1.4 with data on modern frigates and corvettes. Column 9 in
         this table is included in an attempt to make sense of the big differences in BID and
         TID which result from the extremes of short and very lengthy superstructures.
   53   54   55   56   57   58   59   60   61   62   63