Page 166 - Practical Well Planning and Drilling Manual
P. 166
Section 2 revised 11/00/bc 1/17/01 12:04 PM Page 142
[ ] Well Programming
2.1.5
Total $ 21,574 6,302 1,812 1,467 $ 31,155 $9/m
Excess % 100 40 25 100
Cost/bbl $/bbl 35 35 40 50
top m 50 1,000 1,800 2,250
Cement Interval btm m 1,200 2,040 2,450 2,900
Hole Size m 26.00 17.50 12.25 8.50
CEMENT MATERIAL Casing 20.00 13.38 9.63 7.00 TOTAL Cost/Meter
142