Page 163 - Practical Well Planning and Drilling Manual
P. 163
Section 2 revised 11/00/bc 1/17/01 12:04 PM Page 139
Preliminary Work For the Drilling Program [ ]
2.1.5
20,300 229,029 8,700 31,155 107,060 897,598 127,600 1,421,442 100,000 25,000 500,000 25,000 498,886 57,880 200,000 50,000 20,000 10,250 50,000 1,537,016
1,467 62,120 127,600 191,187 5,000 200,000 205,000
20,300 229,029 8,700 29,688 107,060 835,478 1,230,255 20,000 498,886 57,880 50,000 10,250 637,016
100,000 25,000 500,000 20,000 50,000 695,000
5,000 10,000
44
20,000 498,886 57,880 50,000 10,250
7 3
100,000 25,000 500,000 20,000 50,000
DEPTH DEPENDENT ($/m) Deviation surveys 87545 Mud and chemicals 87315 Solids control consum’s 87330 Cement and chemicals 87320 Bits 87301 Casing and accessories 86201 Completion 86201 TOTAL FIXED COSTS ($) Site survey 87110 Rig positioning 87220 Rig mob/demob 87220 Boats mob/demob 87220 Casing crew & eq 87548 Electric logging 87509 Cased hole log & perf. 87509 Well testing
139