Page 111 - Reliability and Maintainability of In service Pipelines
P. 111
100 Reliability and Maintainability of In-Service Pipelines
Christodoulou, S., Aslani, P., Vanreterghem, A., 2004. A risk analysis framework for evaluating struc-
tural degradation of water mains in urban settings, using neurofuzzy systems and statistical model-
ing techniques. Proceedings of the World Water and Environmental Resources Congress and
Related Symposia. ASCE, Philadelphia, PA.
Clair St., A.M., Sinha, S., 2012. State-of-the-technology review on water pipe condition, deterioration
and failure rate prediction models. Urban Water J. 9 (2), 85 112.
Davis, P., De Silva, D., Gould, S., Burn, S., 2005. Condition assessment and failure prediction for
asbestos cement sewer mains, Pipes Wagga Wagga Conference, Charles Sturt University, Wagga
Wagga, New South Wales, Australia.
Davis, P., Marlow, D., 2008. Asset management: quantifying economic lifetime of large-diameter pipe-
lines. J. Am. Water Works Assoc. 110 119.
Deb, A.K., Grablutz, F.M., Hasit, Y.J., Snyder, J.K., 2002. Prioritizing Water Main Replacement and
Rehabilitation. American Water Works Association Research Foundation, Denver, CO.
De Silva, D., Moglia, M., Davis, P., Burn, S., 2006. Condition assessment and probabilistic analysis to esti-
mate failure rates in buried metallic pipelines. J. Water Supply: Res. Technol.-Aqua 55 (3), 179 191.
Ditlevsen, O., Madsen, H.O., 1996. Structural Reliability Methods. John Wiley and Sons, Chichester.
EPA 540-R-02-002, 2001. Risk Assessment Guidance for Superfund: Volume III Part A, Process for
Conducting Probabilistic Risk Assessment, Office of Emergency and Remedial Response, U.S.
Environmental Protection Agency, Washington, DC 20460.
Fares, H., Zayed, T., 2010. Hierarchical fuzzy expert system for risk of failure of water mains.
J. Pipeline Syst. Eng. Pract. 1 (1), 53 62.
Freudenthal, A.M., 1956. Safety and the probability of structural failure. Transactions 121,
1337 1397. ASCE.
Kaempfer, W., Berndt, M., 1999. Estimation of service life of concrete pipes in sewer networks.
In: Lacasse, M.A., Vanier, D.J. (Eds.), Durability of Building Materials and Components 8.
Institute for Research in Construction, Ottawa ON, K1A 0R6, Canada, pp. 36 45.
Kim, J., Bae, C., Woo, H., Kim, J., Hong, S., 2007. Assessment of residual tensile strength on cast
iron pipes. In: Proceedings of the Pipelines: Advances and Experiences with Trenchless Pipeline
Projects, pp. 1 7.
Kleiner, Y., Rajani, B., 2001. Comprehensive review of structural deterioration of water mains: statisti-
cal models. Urban Water 3, 131 150.
Kleiner, Y., Rajani, B., Sadiq, R., 2005. Risk management of large-diameter water transmission mains.
American Water Works Association Research Foundation, Denver, CO.
Kleiner, Y., Rajani, B., 2008. Prioritising individual water mains for renewal. Proceedings of the
ASCE/EWRI World Environmental and Water Resources. National Research Council Canada-
CNRC-NRC, Honolulu, Hawaii, pp. 1 10.
Kong, J.S., Frangopol, D.M., 2005. Sensitivity analysis in reliability-based lifetime performance pre-
diction using simulation. J. Mater. Civil Eng. 17 (3), June 1.
Lee, L.S., Estrada, H., Baumert, M., 2010. Time-dependent reliability analysis of FRP rehabilitated
pipes. J. Compos. Construct., ASCE 14 (3), June 1.
Li, C.Q., Mahmoodian, M., 2013. Risk based service life prediction of underground cast iron pipes
subjected to corrosion. J. Reliab. Eng. Syst. Safe. 119, 102 108. November.
Li, S.X., Yu, S.R., Zeng, H.L., Li, J.H., Liang, R., 2009. Predicting corrosion remaining life of under-
ground pipelines with a mechanically-based probabilistic model. J. Petrol. Sci. Eng. 65 (3 4),
162 166.
Madsen, H.O., Krenk, S., Lind, N.C., 1986. Methods of Structural Safety. Prentice-Hall, NJ.
Mahmoodian, M., Li, C.Q., 2015. Structural integrity of corrosion-affected cast iron water pipes using
a reliability-based stochastic analysis method. Struct. Infrastruct. Eng. 12 (10), 1356 1363.
Available from: https://doi.org/10.1080/15732479.2015.1117114.