Page 168 - Materials Chemistry, Second Edition
P. 168

Ch004-P373623.qxd  3/26/07  4:46 PM  Page 147
                                 Sustainable Development and Environmental Reform
                                                                                   147
                reviewing the EIS report makes the public a partner in the project. They
                know the actual facts about the proposed project.
                Task 4 Final EIS draft: After the responsible agency and the public have
                reviewed the EIS first draft and suggested changes, a final EIS draft is prepared.
                Administrative or policy questions are answered by the agency and given to
                the EIS preparer. He develops answers to the technical comments. The final
                draft is then submitted to the EPA for review and approval. Eventually, EPA
                takes one of the following decisions:

                     • Lack of objection: Project is accepted.
                     • Environmental concern: Mitigating measures are suggested and
                       implemented.
                     • Environmental objection: Changes should be made.
                     • Environmentally unsatisfactory: Project is rejected.




                4.8 Sustainable Development Road Map
                By investigating the elements of the proposed environmental reform structure
                shown in Figure 4.4, one can decide whether or not the country/community
                follows a good reform and how far we are from the good environmental reform
                and what are the missing elements in the current practice. One of the main
                reasons is the absence of a comprehensive framework that provides a strategy
                towards sustainable development. Such a framework can be used by mem-
                bers of society to identify their possible roles. In addition, it can be used by
                the government to design an efficient and strict monitoring system to eval-
                uate compliance to regulations. The reason for the absence of such a frame-
                work is the lack of awareness. Therefore, a framework has been proposed in
                Figure 4.4 that integrates all the essential elements of environmental reform.
                     The sustainable development road map can be developed by the envi-
                ronmental reform proposed structure covered in this chapter which reveals
                the different elements of environmental reform. The last two sections of this
                chapter can be considered as a conclusion of the first four chapters of this
                book. It is clear that the poor–moderate–good implementation of most ele-
                ments is primarily due to lack of awareness. Therefore, a methodology for
                integrating the different elements of environmental reform was illustrated
                by the sustainable development proposed framework section. Using this frame-
                work the members of society can determine the different endeavors that
                need to be adopted to comply with regulations and finally realize sustain-
                able development.
                     The catalyst of this framework is environmental awareness, which is the
                main barrier towards sustainable development. The benefits arising from
                adopting eco-efficiency are numerous and can lead to increased efficiency of
                operation and economic gains. However, most investors are reluctant to adopt
   163   164   165   166   167   168   169   170   171   172   173