Planning and launching the TPM pilot  159


                    Four-day hands-on  workshop
                   The final stage of  securing the necessary commitment is a four-day hands-on
                   TPM workshop carried out on 'live' equipment in the host plant. The delegates
                   will comprise a cross-section of senior management, potential TPM facilitators,
                   union representatives (if appropriate) and some key operators and maintainers.
                   The content of  the workshop is shown in Figure 7.23.
                      The objectives of  the four-day 'in-house'  workshop are:

                        to provide a thorough understanding of  TPM and how to put it into
                        practice;
                      0  to provide a framework and understanding for TPM facilitators to work
                        in, and influence the behaviour of, multi-discipline, multi-interest teams;




                     -  Introduction  to TPM   Recap Brief   Building TPM .4ctivity   Dry Run
                                                         Boards            Preszntationi
                      Ex - Whose Job?   Visit to Pilot  and
                                       Plan the Plan     Consolidatlog Measurement   SYNDICATE
                     *  TPM PRINCIPLES                   and Condition Cycles   PRESENTATTOPIS
                                       Equipment Description
                      Slide Presentation               -  SUPPORTING       REVIEW AUD KEY
                                     n  MEASUREMENT CYCLE   TECHKIQUES     LEARPIING POINTS
                      Ex - OEE         (On-the-Job)      t 5 Whys
                      Ex - Project                       + P-11  Analysis   Ex -Whose  Job7
                         Management    +  HistoryiRecords   t Visual Management
                                       +  OEE Measures   t Set-up Reduction
                                       +  6 Loss Assessment
                     -  TPM TECHNIQUES ANC   CONDITION CYCLE  -  PROBLEM PREVENTION   PILOTS AND 4
                      9-STEP IMPROVEMENT                 CYCLE             STAGE ROLL-OUT
                      PLAN             Ex - Criticality Assessment   (On-the-Job)
                                       (On-the-Job)                        SUPPORTING THE
                     *  SSICAN DO                        +  Best Practice Routines   PILOTS
                                       +  Criticality Assessment   +  Problem  Solving
                      CASESTUDY                                            Course Assessment
                                       +  Condition Appraisal   PREPARE
                      TEAMWORKING &                      PRESENTATIOX      16 00 hrs CLOSE
                      FACILITATING     +  Refurbishment Plan
                      Ex - Active Listening
                                       + Asset Care
                      BRIEFING FOR
                      SYNDICATES
                      On-the-Job  Case Studv
                   Figure 7.23 TPM four-day hands-on workshop progrnmme


                                               Managing Director
                                             Manufacturing Director
                                            Business Unit Manager x 3
                                                Design Manager
                                              Engineering Manager
                                              Mechanical Engineer
                                          Line OperatorsMaintainers  x 8
                                      TOTAL NUMBER OF ATTENDEES = 16

                   Figure 7.24 Attendees at four-day workshop