156  TPM-A  Route to World-Class Performance


                  A further key part of the scoping study (see Step 3 of  Figure 7.2) is to gain
               an assessment of  existing levels of  OEE and the potential for improvement.
                  One of  the most powerful ways of  gaining a 'snapshot' OEE is to carry out
               a study of  a machine, line or process by spending at least a whole shift on the
               specific plant item in order to see the reality of  the actual situation.
                  Figures 7.16, 7.17 and 7.18 show the valuable outputs of  such a study.
                  Figures 7.19 and 7.20  show the results of  a five-month reference period
               analysis to set realistic challenges on downtime and scrap improvement.


                    AVAILABILITY   x   PERFORMANCE    x    QUALITY
                       RATE               RATE               RATE






                    -


                   Wait for technician





               And wraps around roller





               Figure 7.16 Line study: Assessing the six losses

                                    RUNNING AT  R

                      170
                                                                             irolyd
                output
                Wmin) 120                                                    ;;gked
                      100



                       50



                       0
                          06:OO  07:OO  O8:OO  09:OO  1O:OO  11:OO  12:OO  13:OO  14:OO
               Figure 7.17 Line study summary