Page 226 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 226

$ Value of rapidly  45% of total  $ Value of  All installed materials   construction  all installed  in applicable CSI  renewable materials  costs ($) †,§ applicable CSI   uses †  materials  n.a. $ Value of new  All installed items  $ Value of FSC   wood portion of all  made from new wood †,§ new wood portion   installed items  of items  ∗   May include w










           Installed rapidly   renewable materials †  Installed items   made from FSC new   wood †,§











           MRc6: Rapidly  Renewable Materials   (<10-Year Growth)  MRc7: certified wood  TABLE 5.0.4








                                                                                   201
   221   222   223   224   225   226   227   228   229   230   231