118 Chapter Six
Exhibit 6-1
Logistics
Logistics flowchart.
CM/GC must prepare a
logistics plan
Indicate the location of Indicate how the safety
hoists and cranes of the public will be achieved
Location of sheds,
Movement of material
bridges, nets, and signs
Movement of labor
Loading docks, storage
areas, and shanties
Exhibit 6-2 HOIST #1
Labor and materials
Site access plan.
Loading/unloading area
Sidewalk
bridge
Delivery Delivery gate
gate
Tower
outline
Labor gate
Existing
buildilng
Labor gate
Delivery gate Labor gate
Loading/unloading area