Page 167 - Urban Construction Project Management
P. 167
122 Chapter Six
Exhibit 6-5
Item Details Requirements
(Continued)
Safety & Site Prep
Guards booth To control site access
Security fence For securing the area from theft and
access
Security gates Secure access for workers and trucks
Bridges Safety for pedestrians
Security badges Badges required to be worn by all
persons working on the site
Evacuation plan Plan established for vacating the
site in case of a problem
Emergency system Communication system for notification
of fire, collapse, etc.
Emergency contact information
Communication system on site
OSHA protection, signage and logs
Temporary Services and
Facilities
Temporary lighting For security and safety
Temporary power For running the operation
For demolition and abatement
For excavation and foundation
For hoists
For loading dock
For hoist tower lights and outlets
For sidewalk bridge and sheds
Temporary light and power for
construction
For specialty equipment
For elevators
Availability of permanent power
For saws
Welding equipment
Rigging equipment
Derricks
Project signage
Mixing equipment
For water pump
Temporary water and
pump Temporary water for construction
Water barrels for water use and
drainage