Page 169 - Urban Construction Project Management
P. 169
124 Chapter Six
Exhibit 6-5
Item Details Requirements
(Continued)
Permits
Logistics Permits required for implementing
the logistics plan
Construction Permits from regent Building
Department and Transit Authorities
Labor Overtime work permit
Required permits for
temporary facilites used
during construction
Sidewalk closing
Lane closing
Relocation of hydrants
Relocation of parking meters
Relocation of affected transit signage
Installation of personnel hoists
Installation of material hoists
Installation of barricades in roadway
and cross-walks
Relocation of bus stops
Relocation or closing of subway
entrances
Sidewalk bridge and shed
Scaffolding
Permits for storage Dumpsters
Trailers
Construction materials
Portosans
Vehicles
Crane permit
Derrick permit
Rigging permit
Vertical Transportation/
Sidewalk Bridge/Sheds
Parking for pumper Location of truck for pumping concrete
Parking of trucks Concrete, steel picks, equipment picks
Sidewalk closings Closing of pedestrian sidewalks for
projects requirements
Street closing Closing of streets for project
requirements