Page 170 - Urban Construction Project Management
P. 170
Logistics 125
Exhibit 6-5
Item Details Requirements
(Continued)
Road lane closing Parking of equipment or storage area
Location of hoist Internal or external to building?
Construction personnel hoists
Construction material hoists
Combination personnel/material hoists
Lifting labor and materials
Loading dock for hoists
Barricades for hoists and loading dock
Signange
Flashing yellow caution lights
Concrete foundation pad for hoist
Tie backs of hoists to the structure
Runaways from hoist tower to building
Power for lighting and outlets at hoist
landings and loading dock
Engineering
Sidewalk closing
Lane closing
Direction or flow of traffic
Zone of influence of the hoist for
sidewalk bridge
Sidewalk bridge for pedestrian protection
Lighting under sidewalk bridge
Anchorage of sidewalk bridge
Weather-resistant enclosure at hoist
entrance to building
Ramps from hoist entrance into
building
Coordination of hoist location with
permanent building facilities
Use of hoists for construction of
tenant fit up program
Elevators Schedule for the availability of
permanent service and passenger
elevators
Interim use of service elevators
Interim use of passenger elevators
Crane Operating criteria
Derricks Operating criteria