Page 170 - Urban Construction Project Management
P. 170

Logistics  125
                                                                                   Exhibit 6-5
           Item                   Details                          Requirements
                                                                                   (Continued)
           Road lane closing      Parking of equipment or storage area
           Location of hoist      Internal or external to building?
                                  Construction personnel hoists
                                  Construction material hoists
                                  Combination personnel/material hoists
                                  Lifting labor and materials
                                  Loading dock for hoists
                                  Barricades for hoists and loading dock
                                  Signange
                                  Flashing yellow caution lights
                                  Concrete foundation pad for hoist
                                  Tie backs of hoists to the structure
                                  Runaways from hoist tower to building
                                  Power for lighting and outlets at hoist
                                  landings and loading dock
                                  Engineering
                                  Sidewalk closing
                                  Lane closing
                                  Direction or flow of traffic
                                  Zone of influence of the hoist for
                                  sidewalk bridge
                                  Sidewalk bridge for pedestrian protection
                                  Lighting under sidewalk bridge
                                  Anchorage of sidewalk bridge
                                  Weather-resistant enclosure at hoist
                                  entrance to building
                                  Ramps from hoist entrance into
                                  building
                                  Coordination of hoist location with
                                  permanent building facilities
                                  Use of hoists for construction of
                                  tenant fit up program
           Elevators              Schedule for the availability of
                                  permanent service and passenger
                                  elevators
                                  Interim use of service elevators
                                  Interim use of passenger elevators
           Crane                  Operating criteria
           Derricks               Operating criteria
   165   166   167   168   169   170   171   172   173   174   175