Page 181 - Urban Construction Project Management
P. 181
136 Chapter Six
Exhibit 6-17
Item Included
Temporary
services checklist. 1. Power for demolition and abatement
2. Power for excavation and foundation
3. Power for hoists
4. Power for loading dock
5. Power for hoist tower lights and outlets
6. Power for sidewalk bridge and sheds
7. Power for field office and shanties
8. Temporary light and power for construction
9. Power for specialty equipment
10. Power for elevators
11. Availability of permanent power
a) Saws
b) Welding equipment
c) Rigging equipment
d) Derricks
e) Project signage
f) Mixing equipment
g) Temporary water and pump
12. Temporary toilets/portosans
13. Temporary water for construction
14. Water barrels for water use and drainage
15. Standpipe for fire protection
16. Siamese connection to feed standpipe
17. Temporary roof
18. Maintenance of temporary systems
19. Utilizing permanent systems for use during construction
20. Temporary heat
21. Interim cooling and dehumidification
22. Interim use of service elevators
23. Interim use of passenger elevators
24. Interim use of building loading dock
25. Protection of facilities
26. OSHA protection, signage, and logs
27. Work that may affect the Transit Authority and
zone of influence
28. Maintenance of temporary facilities and standby
operating personnel
29. Maintenance of permanent facilities and systems
used during the construction process, and the
refurbishment of the equipment and extension of all
guarantees and warranties