Project Documentation, Logs, and Reports 271
Exhibit 14-6
C o a r t n r o t c D a y Deta Daily log.
J o b N a m e Job No
Field Notes Weather
Temp
C s t f a r m e n N o
Superintendent
Clerk
Bricklayers
Carpenters
Cement Masons
Electricians
Iron Workers
Laborers
Operating Engrs
Plumbers
Pipe Fitters
Sheet Metal
Total
Equipment Hrs
Contract Extras Authorized By Amount Material Purchases
Equipment Rented Today From Rate
Approved
are working, number of personnel that are working, weather conditions, and any
usual events that may have occurred that day. Exhibit 14-6 contains a sample daily
log.
22. Daily construction report—This report documents in detail the type of work that is
being performed by each trade and the overall progress of the project, in more
detail than the daily log. Exhibit 14-7 contains a daily construction report.
23. Manpower reports—These reports are utilized to document the number of workers
in all capacities (foreman, journeyman, apprentices, minority and disadvantaged
personnel, etc.) that are performing work on the project each day.
24. Daily equipment use log—This log keeps track of all of the major equipment, mostly
for logistical purposes, such as the tower cranes, hoist, pumps, bulldozers, lifts, lulls,
heaters, and crawling cranes. Exhibit 14-8 contains a daily equipment use log.