Page 318 - Urban Construction Project Management
P. 318

272    Chapter Fourteen
         Exhibit 14-7                                                     DATE  S  M  T  W TH  F  S
         Daily construction                                                DAY
                             Project
         report.
                             J o b  N  . o                               W E A T H E R
                              e i l C  t n                               T E M P
                             C o  a r t n  r o t c                       W I N D
                             P  e j o r  t c  M a n a g  r e             H U M I D  T I  Y

                             AVERAGE FIELD FORCE
                                 Name of Contractor  Non-manual     Manual           Remarks




                             VISITORS
                                 Name of Contractor  Non-manual     Manual           Remarks





                             EQUIPMENT AT THE SITE

                             CONSTRUCTION ACTIVITIES















                             D S I  T  B I R  U  I T  O N                P A G E  1 O F  _ _ _ _ _ _  P A G E S
                                    1. Project Manager
                                    2. Field Office
                                    3. File
                                    . 4  O w n  r e      g i S  n  : e r u t a   : e l t i T




                            25. Equipment delivery and installation log—This log tracks the major deliveries of all
                                construction materials and equipment to the site, and when and were they are
                                installed. Exhibit 14-9 shows an equipment delivery and installation log.
                            26. Off-site storage log—This log is utilized to keep track of all materials and equip-
                                ment stored off-site awaiting delivery to the project site. Materials are often stored
                                in bonded warehouses in close proximity to the construction site, so that when they
                                are needed they can be readily delivered. Exhibit 14-10 is an off-site storage log.
                            27. Request for information (RFI) log—The RFI log is used to track the status of all
                                RFIs and their answers. RFIs can be used to verify verbal information and direction,