Page 391 - Water and wastewater engineering
P. 391

10-8   WATER AND WASTEWATER ENGINEERING

                                The Ideal Sedimentation Basin.  Camp (1936) proposed a rational theory for removal of dis-
                            cretely settling particles in an ideal settling basin. The ideal settling basin theory assumes the
                            following:

                                  •  Type I settling.
                                 •  Four zones in the basin: inlet, outlet, sludge, and settling.
                                 •  Even distribution of flow (uniform horizontal velocity) entering the settling zone.

                                 •  Even distribution of flow leaving the settling zone.
                                 •  Uniform distribution of particles through the depth of the inlet zone end of the settling zone.
                                 •  Particles that enter the sludge zone are captured and remain in the sludge zone.
                                 •  Particles that enter the outlet zone are not removed from the water.

                              Figure 10-4 is a schematic drawing of the zones in a horizontal flow clarifier and in an upflow

                            clarifier.


                                Target
                                baffle
                                           Perforated baffle         Effluent
                                                                      weir
                            Q
                                                    Settling
                                                     zone

                                   Inlet                            Outlet
                                   zone                             zone
                                                  Sludge zone

                                                      (a)
                                                 Q
                            Outlet
                             zone

                            Settling
                             zone

                             Inlet
                             zone
                                              Sludge zone


                                                 (b)
                              FIGURE 10-4
                               Zones of sedimentation: ( a ) horizontal flow clarifier; ( b ) upflow clarifier.
                             ( Source:  Davis and Cornwell, 2008.)
   386   387   388   389   390   391   392   393   394   395   396