Page 361 - Fluid Power Engineering
P. 361
Planning and Execution of W ind Projects 321
at a cost premium compared to owner-operated wind farm; however,
the two models lower the risk to financiers.
References
1. American Wind Energy Association. Wind Energy Siting Handbook, AWEA,
Washington, DC, 2008.
2. Sedgwick, B. “Wind farm infrastructure: A primer,” North American Wind
Power. 2007, July.
3. ERCOT, Operations Support Engineering, New Generator Commissioning
Checklist[Online]April2009.http://www.ercot.com/services/rq/re/reg/
New%20Generation%20InterConnection%20-%20QSE%20checklist%20-
%20v1%205.doc.