134                                                                               Boiler Operator’s Handbook

               cycling is a normal condition.                       visual inspection by a National Board Certified Inspec-
                    In case you haven’t already figured it out, I dislike  tor before the certificate to operate is issued.
               steam powered instantaneous hot water heaters because     Initial operation of the burner should be achieved
               they produce load swings in the summer that prevent  under the supervision of a technician trained in the
               smooth and constant operation of the boilers. Now that  proper set up of a fired piece of equipment. That techni-
               I’ve made my position clear (that storage is a necessity)  cian should produce a “start-up sheet,” a document that
               it’s time to talk about operation and control of hot water  includes, as minimum: The name, address, and phone
               heaters.                                             number of the technician’s employer, the technician’s
                    Figure 4-9 is a graphic of a boiler and storage tank  name and signature, and the date the initial start-up was
               system typical of that used in a large apartment building.  performed; a record of the actual settings of the operating
               Cold city water enters the system at the bottom center of  limit (OL) and the high limit (HL) temperature switches
               the graphic where it can either enter the circulating pump  and an indication that their operation was confirmed; a
               or the storage tank. Service water is drawn off the top of  record of the setting of the pressure-temperature relief
               the tank. The arrow at the bottom right side of the tank  valve and a record that its operation was confirmed; a
               represents flow of water circulated through the system to  record of the burner performance while firing including,
               maintain hot water in the piping distribution system.  but not necessarily limited to: stack temperature, flame
                    This combination of heater and storage will cycle  signal measurement, percent oxygen in flue gas, carbon
               but it has the advantage of extended cycle operation and  monoxide level of flue gas, if measured, smoke spot test
               a fixed firing rate for the burner that makes it efficient,  recording (oil only) if measured, gas consumption rate
               but still simple to operate and maintain, if you know  (gas firing), temperature of water at the boiler inlet dur-
               what you’re doing.                                   ing normal operation, temperature of water at the boiler
                    A service water boiler deserves the same attention  outlet during normal operation, pressure at the inlet
               as a heating boiler on initial start-up. Before the system  of the system, pressure at the discharge of the pump
               is started the owner, design engineer or installing con-  or other location between pump and boiler, and posi-
               tractor (depending upon the requirements associated  tion of the throttling valve. The start-up sheet should
               with installation) should contact the owner’s insurance  be retained as a part of the original documentation for
               company or the authority having jurisdiction (normally  the system and referenced on each subsequent start-up
               the state, county or municipality) to obtain a boiler cer-  (after shutdowns for maintenance or other purposes) to
               tificate (or a document of similar title) which authorizes  ensure the conditions do not differ substantially from
               the owner to operate the boiler. There may be provisions  the original start-up conditions.
               in the jurisdiction to exempt certain equipment but any     All openings into the boiler and tank should be
               requirements should be determined before placing the  checked to ensure the system is closed and will not lose
               system in service. Normally the boiler is subjected to a  water unintentionally when placed in service. Before
                                                                    closing openings the internals should be inspected to
                                                                    ensure there are no loose parts, tools, personnel, or any-
                                                                    thing else inside the system that does not belong there.
                                                                        Valves and some spigots are opened to vent air and
                                                                    admit water until the system is flooded and at city water
                                                                    pressure. It is important to note that, if the city water
                                                                    supply to the inlet shown in the graphic is separated
                                                                    from the city water supply by a check valve or back-
                                                                    flow preventer, an expansion tank or similar provision
                                                                    is required to prevent an increase in the system pressure
                                                                    when the water expands as it is heated.
                                                                        Disconnects, circuit breakers, and control switches
                                                                    are closed (in that order) to permit system operation.
                                                                    The circulating pump should start first, followed by the
                                                                    burner. The start-up sheet should be checked as soon as
                                                                    operation stabilizes to ensure the conditions do not dif-
                                                                    fer substantially from the original start-up conditions.
                     Figure 4-9. Service water heating system           Since the first edition of this book was written the