Special Systems                                                                                      135

               Codes have changed and in every state and province all  sure to prevent flow of water through the boiler during
               hot water boilers must have a low-water cutoff. If your  this period. Sometimes the valve is fitted with a spring
               boiler is equipped with a low-water cutoff its operation  rather than using weight. Don’t put another type of
               should be confirmed during fill-up and before the burn-  valve in its place or it may not work.
               er is fired. Since service water heaters are seldom fitted     As the hot water flows out the top of the tank it is
               with a gage glass this test assumes a water level. Turn  replaced by cold water entering the bottom of the tank.
               control power on before filling the boiler; the burner  The interface level raises until it is above the level of the
               should not start. Then constantly monitor it to note that  upper temperature control switch (TC1). Contacts on
               the burner starts to fire once the level reaches the low-  TC1 close to start the pump. Auxiliary contacts on the
               water cutoff and closes its contacts. Then, immediately  pump motor starter close to bypass the TC1 Contacts so
               shut off the water supply and open the drain. If the low-  the pump will not stop when the TC1 contacts open. The
               water cutoff is operating properly it should immediately  auxiliary contacts also permit burner operation.
               stop burner operation. If it doesn’t secure the burner     Whenever hot water demand does not exceed the
               yourself and see to it that it’s fixed. Secure the drain turn  capacity of the boiler the system continuously repeats
               the power off and fill the system completely venting at  the operation described above. The pump and boiler
               all points before restoring power.                   start, heat a volume of water equal to the volume of the
                    When stable operation is achieved the throttling  storage tank between TC1 And TC2, then stop and wait
               valve (TV) should be adjusted to achieve the desired  until that volume of hot water is consumed.
               outlet temperature as indicated by the thermometer (T2)     When service water demand exceeds the capacity of
               at the boiler outlet. Throttling of that valve is normally  the boiler the difference between hot water demand and
               required to restrict the rate of water flow through the  boiler capacity is made up by hot water flowing out of the
               boiler to get the desired hot water temperature. If the  storage tank and cold water entering the tank. The tank
               valve is open too far the flow exceeds the design flow  supplies all the hot water until the level is above TC1 then
               rate and boiler outlet water temperature is too low. If the  the hot water from the boiler and the hot water stored in
               valve is throttled too much the boiler will heat the water  the tank combine to serve the hot water demand.
               excessively and the burner will start short cycling on the     Whenever the service water demand exceeds the
               operating limit (OL).                                capacity of the boiler the elevation of the interface in-
                    Think about it, what’s a Btu? If the heater is fired  creases. Provided the high demand does not continue
               at a constant rate (most are) then there is a consistent  until the hot water stored in the tank is consumed the
               output in Btu. Since the water flow is constant (the tank  boiler will continue to fire until the storage tank is once
               is a detour for any water that isn’t used in the system)  again filled with hot water down to the level of TC2,
               the water temperature rise should be constant.       completing a boiler operating cycle.
                    Provided the demand for hot water does not exceed     Under unusual  circumstances of sustained  high
               the capacity of the boiler, hot water will enter the tank  demand for hot water the reserve in the storage tank is
               faster than it flows to the building. Therefore some of the  consumed. Thereafter the water leaving the system will
               water heated by the boiler remains in the tank, mixing  be a mix of cold water passing up through the tank and
               with and displacing the cold water. Once the volume of  hot water produced by the boiler. Hopefully this will
               the tank above the inlet pipe from the boiler is filled with  never be the case in your plant. If it frequently is, sug-
               hot water an interface forms between the hot and cold  gest a larger tank, larger boiler, or a combination because
               water because the cold water is denser than the hot water.  there’s a hazard associated with it that is not desirable.
                    Boiler operation continues and hot water displaces     You may wonder why there are two temperature
               the cold water in the tank until the level of the interface  switches on the tank. Tests I performed indicate the
               drops to the level of the lower tank temperature control  interface in a storage tank has a temperature gradient
               switch (TC2) to terminate heating operation. The open-  of 5 to 10 degrees per inch depending on turbulence. A
               ing of contacts on the lower tank temperature control  system with a single temperature control would cycle
               switch interrupts operation of the pump and burner to  on and off frequently as the interface rises and falls dur-
               complete a heating cycle.                            ing each cycle. Each time the burner starts and stops a
                    During the period when the circulating pump and  purge is performed that, despite its purpose of safety,
               burner are shut down the building is supplied by hot  cools the boiler and water with purge air. Provision of
               water from the tank. The weight of the check valve on  two temperature controls properly spaced (more on that
               the pump discharge provides sufficient differential pres-  later) can significantly reduce losses and wear and tear