306                                                                               Boiler Operator’s Handbook


                                                                    blowoff piping.
                                                                        Threaded pipe and fittings can be assembled by
                                                                    anyone and you can replace damaged piping yourself
                                                                    provided you use the materials required by the code.
                                                                    Replacing flanges and fittings is usually simple because
                                                                    they are marked and all you have to do is find materials
                                                                    with matching marks. Pipe, on the other hand, can vary
                                                                    from code quality to what we call “untested” pipe with
                                                                    some different grades in between and you usually won’t
                                                                    find any markings on the damaged pipe to get a clue as
                                                                    to what material is required.
                                                                        There are many different grades of quality of mate-
                                                                    rial that can be provided in compliance with the ASME
                                                                    Code and there are many ASME material specifications
                                                                    for material that isn’t satisfactory for boiler external pip-
                                                                    ing. Your insurance inspector should be able to tell you
                                                                    what material to specify when replacing boiler external
                                                                    piping. When you buy it you should request Mill Test
                       Figure 10-39. Seatless blowoff valve
                                                                    Certificates  and  check  the  stamping  (grade  and  heat
                                                                    number) on the pipe against the data on the certificate.
               Boiler External Piping                               Record in your maintenance log that the material and
                    The extent of the jurisdiction of the code for con-  paperwork match and return both if they don’t.
               struction of power boilers extends to the far side of the     If the pipe is welded you can only repair or re-
               second shutoff valve from the boiler on steam, blowoff,  place it if you are certified to do so by the ASME or the
               and feedwater piping. The jurisdiction extends to the far  National Board. Unless you work for an employer that
               side of the first shutoff valve on all other connecting pip-  maintains several boilers with a need for regular repair
               ing. All boiler external piping must be made of materials  of boiler external piping it doesn’t pay to obtain that
               certified to comply with ASME Codes and all welded  certification. It’s much less expensive to locate a contrac-
               piping must be fabricated by a manufacturer or contrac-  tor that is certified and have them do the work for an
               tor certified by ASME to do that work                occasional repair.
                    A piece of welded piping should be stamped or       Adding a connection to boiler external piping
               fitted  with  a  securely  attached  nameplate  containing  can only be done by a certified contractor and many
               the stamping required by the ASME Code. The stamp-   an owner has had to employ a certified contractor to
               ing should include either the “S,” “A,” or “PP” Stamp.  remove and replace connections that were installed by
               You may also find the National Board “R” stamp which  the operators, the facility’s maintenance personnel or an
               indicates a contractor has repaired the piping. Be aware  unqualified contractor. For a short period in history we
               that the boiler inspector could look for those stampings  built a lot of sections of boiler external piping around
               at any time and they better be there or you will not be  Baltimore to replace piping installed by unauthorized
               allowed to operate the boiler until a complying section  contractors. That was usually at the contractor’s ex-
               of piping is installed.                              pense because the installation didn’t pass initial inspec-
                    I recall one incident where an owner moved the  tion. Sometimes, however, the owner had to pay the bill.
               entire boiler plant to make room for a new baseball      There’s  probably  no  difference  in  the  quality  of
               stadium and the contractor’s personnel threw away the  the work but unless the contractor is qualified you will
               boiler feed piping thinking they could replace it easily  never know. How would the inspector know if you had
               when they reached the new site. We made a fair amount  added a connection? Well, all you have to do is look
               of money installing new piping (replacing what the  for the ASME P-4 and any National Board R-1 forms
               contractor had installed and at the contractor’s expense)  you have. They describe the initial construction and all
               after the job was ready for inspection and the boiler  repairs. If a connection is not described on those forms
               inspector couldn’t find the stampings. The work was  it isn’t in compliance. You should keep all those forms,
               accelerated because everything else was ready to make  which are actually certifications, for the boiler external
               steam. Luckily the contractor did move the steam and  piping along with the forms for the boiler itself.