Plants and Equipment                                                                                305


               scheduled by the boiler and the load more than anything  designed to handle flashing steam. There’s supposed
               else so the operators have to get at them quickly.   to be an orifice or manually adjusted throttling valve to
                                                                    take the pressure drop located in the piping close to, and
               Valves, Feedwater                                    farther from, the boiler than that automatic valve. If not,
                    On low pressure boilers the code requires a stop  or the orifice is removed or the throttling valve opened
               valve and check valve on the boiler feed piping but the  wide the automatic valve will most certainly fail.
               pipe itself isn’t controlled by the code. The Code has     Bottom blowoff valves come in a variety of forms
               specific requirements for the feedwater piping on a high  but the most important part of their construction is they
               pressure boiler out to the second stop valve and also re-  don’t have any pockets or cavities that sludge can settle
               quires a check valve. That arrangement normally means  into and plug up. That’s the idea anyway. I can only
               the bypass valve and isolating valve for the feedwater  remember one time where I was tearing valves off to
               control valve are both within the limits of the boiler ex-  unplug a line and that’s because someone had installed
               ternal piping.                                       the valves backwards so all the mud settled on top of
                    The shutoff valve is there to allow you to isolate  the discs preventing opening the valves. There are two
               the boiler from the feedwater supply when it’s shut  things that are stressed by these points, use proper
               down and, more importantly, isolate the feedwater  valves (ones designed for bottom blowoff applications)
               system from pressure in the boiler. The check valve is  and make sure you installed them in the right direction.
               there to help prevent draining water from the boiler in  See the section on normal operation for operation of
               the event there’s a failure of the feedwater supply and,  blowoff valves.
               more importantly, preventing boiler water leaking out to     The code for high pressure boilers requires two
               produce a steam explosion if there’s a failure of the pip-  valves for bottom blowoff designed for the service. The
               ing. Unlike the steam valves and piping there is no code  piping connecting them and the boiler must be at least
               requirement for a free blow drain connected between  schedule 80 (extra heavy) of materials certified to com-
               the two isolating valves on a high pressure feedwater  ply with ASME Codes and all welded. Piping inside the
               line; there should be, and for the same reasons.     second valve must be fabricated by a manufacturer or
                                                                    contractor certified by ASME to do that work (See the
               Valves, Blowdown and Blowoff                         section on ASME Code construction). All other blowoff
                    The valve for manual control of continuous blow-  and blowdown connections only require one valve and
               down (surface blowoff) should be provided with an  the code piping requirements are limited to the portion
               indicator that shows the position of the valve so an  between valve and boiler. You may find two valves in
               operator can restore a particular valve position. Some  other lines because the owner or contractor elected to
               valves are fitted with indicators and tapered throttling  have an accessible valve to use with the code required
               guides as part of the disc so the flow rate through the  valve and piping located close to the boiler thereby lim-
               valve is proportional to the indicated valve position. The  iting the extent of the code piping.
               ability to closely regulate the flow of blowdown (inde-     Low pressure boilers and some high pressure boil-
               pendent of automatic blowdown controls) permits the  ers are equipped with quick opening valves, a valve that
               operator to closely control the concentration of solids in  works something like a gate valve but has a steel plate with
               the boiler.                                          a hole in it that is positioned in line with the pipe so there’s
                    It isn’t essential and not required by the code but  no way for mud to plug the valve. The code permits one
               I would strongly recommend installation of a check  of the two valves required on high pressure boilers to be
               valve between the continuous blowdown control valve  a quick opening valve. There are rules for operating those
               and the boiler. Should you forget to close the continu-  valves (see normal operation) and they should be installed
               ous blowdown valve it will prevent water from another  in a manner that makes it easy to use them.
               boiler entering the idle boiler. It’s also like using a non-  The seatless blowoff valve (Figure 10-39) is a com-
               return valve, if you chose to you can rely on the check  monly used bottom blowoff valve and one that I have
               valve so you don’t have to close the blowdown control  seen operated improperly more than any other valve
               valve (and reset it later) for short outages.        (see normal operation) but it is easily repaired. Unlike
                    I’ve seen many an automatic blowdown control  other types of valves it doesn’t require skill or special
               system isolated because the blowdown control valve  tools to repair or even adjust to restore its shutoff ca-
               failed. On most small boilers these are quarter turn  pability. The manufacturer’s instruction manual is very
               motor actuated valves or solenoid valves which aren’t  important reading before working on these valves.