Page 145 - Compression Machinery for Oil and Gas
P. 145

132 SECTION    II Types of Equipment


            [20] E. Abraham, H. Miller, Meeting compression train base package design requirements for ser-
                vice on floating production storage and offloading vessels, in: Proceedings of the Asia Turbo-
                machinery and Pump Symposium, Singapore, February 22–25, 2016, 2016.
            [21] S.L. Ross, R.F. Beckinger, Compressor seal selection and justification, in: Proceedings of the
                Thirty-Second Turbomachinery Symposium, Turbomachinery Laboratory, Texas A&M Uni-
                versity, College Station, TX, 2003, pp. 167–177.
            [22] ASTM D6439-11, Standard Guide for Cleaning, Flushing, and Purification of Steam, Gas, and
                Hydroelectric Turbine Lubrication Systems, ASTM International, West Conshohocken, PA,
                2017.
            [22a] API RP 686, Recommended Practice for Machinery Installation and Installation Design, sec-
                 ond ed, (December 2009).
            [23] C. Meher-Homji, P. Pillai, R. Kurz, P. Rasmussen, Short course 7: LNG liquefaction plants—
                overview, design & operation, in: Proceedings of the Forty-Sixth Turbomachinery Sympo-
                sium, Turbomachinery Laboratory, Texas A&M University, College Station, TX, 2017.
            [23a] C.R. Sparks, On the transient interaction of centrifugal compressors and their piping systems,
                 ASME 83-GT-236(1983).
            [23b] R. Kurz, R. McKee, K. Brun, Pulsations in centrifugal compressor installations, ASME Paper
                 No. GT2006-90700. (2006).
            [23c] K. Brun, M. Nored, R. Kurz, Impact of the piping impedance and acoustic characteristics on
                 centrifugal compressor surge and operating range, ASME Paper No. 2014-2504. (2014).
            [24] P.C. Rasmussen, R. Kurz, Centrifugal compressor applications-upstream and midstream,
                in: Proc. 38th Turbomachinery Symposium, Houston, TX, 2009.
            [24a] R. Kurz, S. Ohanian, K. Brun, Compressors in high pressure pipeline applications, ASME
                 GT2010-22018. (2010).
            [25] C. Geary, L. Damratowski, Evolution of high-pressure gas-injection centrifugal compressors,
                J. Pet. Technol. (1977) 630–638.
            [25a] TMI Staff and Contributors, A new high in compression pressures, Turbomachinery Maga-
                 zine, (December 31, 2017).
            [25b] G.M. Colby, T.R. Griffin, M.K. Gupta, H.F. Miller, S.E. Nove, N.H. Sehlstedt, High pressure
                 CO 2 compressor testing for Tupi 1, Tupi 2, and Tupi 3, Paper No. GT2012-70137,
                 pp. 1025–1032, https://doi.org/10.1115/GT2012-70137.
            [26] M. Sandberg, Discussion group: advanced centrifugal compressors, in: 40th Turbomachinery
                & 27th Pump Users Symposia, 2011, Houston, TX, 2011.
            [27] B.C. Pettinato, C.H. Cloud, R.S. Campos, Shop acceptance testing of compressor stability and
                theoretical correlation, in: Proceedings of the Thirty-Ninth Turbomachinery Symposium,
                Turbomachinery Laboratory, Texas A&M University, College Station, TX, 2010, pp. 31–42.
            [27a] J.J. Moore, S.T. Walker, M.J. Kuzdal, Rotodynamic stability measurement during full-load
                 full-pressure testing of a 6000 psi reinjection centrifugal compressor, in: Proceedings of the
                 31st Turbomachinery Symposium 2002, Turbomachinery Laboratory, Texas A&M Univer-
                 sity, College Station, TX, 29–38.
            [28] Y. Bidaut, U. Baumann, S.M.H. Al-Harthy, Rotordynamic stability of a 9500 psi reinjection
                centrifugal compressor equipped with a hole pattern seal—measurement versus prediction tak-
                ing into account the operational boundary conditions, in: Proceedings of the Thirty-Eighth Tur-
                bomachinery Symposium, Turbomachinery Laboratory, Texas A&M University, College
                Station, TX, 2009, pp. 251–259.
            [29] M. Pillarella, Y.N. Liu, J. Petrowski, R. Bower, The C3MR Liquefaction Cycle; Versatility
                for a Fast Growing Ever Changing LNG Industry, Air Products and Chemicals Inc.,
                Pennsylvania, 2007
   140   141   142   143   144   145   146   147   148   149   150