Page 521 - Construction Waterproofing Handbook
P. 521

GUIDE SPECIFICATION FOR WATERPROOFING  15.5
              1.06  DELIVERY, STORAGE, AND HANDLING

                    A.     Delivery
                           1.    Materials should  be delivered  in manufacturer's original, unopened packaging  with
                                 labels  attached,
                    B.     Storage

                           1.    Store materials in the original unopened packages.
                    C.     Handling

                           1.    All  materials  must  be  handled  in  a  manner  to  prevent  damage.  Any  material
                                 damaged must be removed from the project area and replaced with new material.
                           2.    Miradrain materials  must be handled  in accordance with Mirafi  guidelines.

              1.07  PROJECT CONDITIONS/SITE  CONDITIONS

                    A.     When Miradrain is installed in conjunction with a waterproofing product, the Miradrain  must be
                           compatible  with  the  waterproofing  product  and  installed  by  methods  acceptable  to  the
                           waterproofing product manufacturer.

                    B.     The outfall for any drainage pipe used with the drainage panels shall be coordinated with the
                           site drainage.

              Ed Note:  Below pertains to the American Institute of Architects (AIA) "General Conditions of the Contract for Construction," which places
              responsibility for means, methods and techniques of construction upon the contractor.
                    C.     Project Conditions:  Refer to  "Conditions  of the Contract"  for  control  and  responsibility  of
                          project site including means, methods and techniques  of construction by the contractor.
                    D.     Field  Measurements:  Verify  actual  measurements/openings  by  performing  field
                          measurements  before  fabrication;  show  recorded  measurements  on  shop  drawings.
                          Coordinate field  measurements,  fabrication  schedule with construction  progress  to  avoid
                          construction delays.
              Ed Note:  Below warranty article requires coordination with the owner.  Below assumes the use of the American Institute of Architects (AIA)
              "Conditions of the Contract for  Construction."
             FIGURE 15.1 (Continued)  Guide specification for section 2715, prefabricated drainage system. (Courtesy TC MiraDRI)