Page 611 - Corrosion Engineering Principles and Practice
P. 611

574    C h a p t e r   1 3                                                                                                        C a t h o d i c   P r o t e c t i o n    575


                        –2500


                       Pipe to soil potential (vs. CSE, mV)  –1500  “On” potential
                        –2000




                                                     “Off” potential
                        –1000


                         –500


                            0
                               0+00  1+00  2+00  3+00  4+00  5+00  6+00  7+00  8+00

                                                   Distance

                      FIGURE 13.36  Over-the-line survey with cathodic protection.
































                      FIGURE 13.37  Instrumentation to carry out a Pearson survey.
                      (Photo courtesy of Tinker & Rasor)