Page 263 - Decision Making Applications in Modern Power Systems
P. 263
proposed the of effectiveness the showed results obtained The of set a using uncertainties DG various the handling in stochastic scenarios predefined handled is networks distribution active in management uncertainty The approach scenario-based a using the during uncertainties the considering t
33-bus 9-bus 547-bus 8-feeders network 11-bus 45-bus 547-bus simulation; Carlo
Monte
approach MCS, capacity;
Scenario-based Possibilistic Probabilistic Probabilistic Hybrid probabilistic possibilistic hosting HC,
2011 2011 2017 2017 2011 generation;
Distributed
[14] [15] [16] [17] [18] DG,