Page 264 - Decision Making Applications in Modern Power Systems
P. 264
handled the under of lack
of set is during and analytical presence and for active
proposed a using networks solutions investment performance an as decision-making the in presented active of tool on
the uncertainties effective is HC uncertainties a as power method.
of uncertainties distribution realistic of network is the in reconfiguration the DG problem proposed output
effectiveness DG active the and effect the and losses model them or approach calculate to several system was DG in estimate point
the various in approach considering confident to analyze active proposed assists that uncertainties evaluation proposed of uncertainty PEM,
showed the management that lead to on the operators reinforcement HC is considering modeling possibilistic probabilistic of agent;
results handling scenarios scenario-based concluded problem proposed is units DG that network load and stochastic tool networks the in data effect networks sorting
obtained in predefined uncertainty a authors optimization tool of fluctuations concluded network for for units three-step assessment distribution hybrid the the of nondominated
The stochastic The using The fuzzy A operation load was It tool process DG of A risk A confirmed A analyzing losses
NSGA,
33-bus 9-bus 547-bus 8-feeders network 11-bus 45-bus 547-bus simulation; Carlo
Monte
approach MCS, capacity;
Scenario-based Possibilistic Probabilistic Probabilistic Hybrid probabilistic possibilistic hosting HC,
2011 2011 2017 2017 2011 generation;
Distributed
[14] [15] [16] [17] [18] DG,